Mkpor, Project Scheduler SUMMARY_______________________________________________________________ Mr. Ekene has over 6 years
of project planning, project scheduling, and project controls experience in
the oil and gas industries. He has coordinated and managed project schedules
for all EPC activity and discipline work for many leading industry end-users
and is knowledgeable of methodology and programs used on most projects. EXPERIENCE___________________________________________________________ Feb. 2014 – Present CDI Engineering Turnaround
Project – Shell Deer Park Project Scheduler. Prepare
and manage level 4 project schedule (2200 lines) within Primavera P6 for all
engineering activities including resources. Deliver Primavera project planner
reports and analysis for sponsors. Prepare Critical Path Method (CPM)
schedules as required or requested by project manager. Project
Dawn – Solvay Project Scheduler. Prepare
and manage level 4 project schedule (4500 lines) within Primavera P6 for all
EPC activities. Deliver Primavera project planner reports and analysis for
stakeholders. Prepare Critical Path Method (CPM) schedules as required or
requested by stakeholders. KM
Station 106 Flexibility and Expansion Project – Kinder Morgan Project Scheduler. Prepare and manage level 4 project schedule (800 lines)
within Microsoft Project and Primavera P6. Assist in the creation of project
WBS, resource allocation and loading, as well as provide key project tracking
data to appropriate stakeholders and client. Analyze the Integrated
Project Schedule (IPS) to ensure alignment with the Engineering, Procurement
and Construction schedule. Responsible for ensuring project actuals are
uploaded to client’s server. KM
Station 114 Flexibility and Expansion Project – Kinder Morgan Project Scheduler. Prepare and manage level 3 project schedule (450 lines)
within Microsoft Project for all engineering and procurement activities. Responsible
for preparing construction graphic materials to include but not limited to
schedule progress reports, trend and schedule analysis graphs on a periodic
basis as determined by the construction lead. KM
Station 96 Flexibility Project – Kinder Morgan Project Scheduler. Prepare and manage level 3 project schedule (450 lines)
within Microsoft Project for all engineering and procurement activities. KM
Station 200 Bidirectional Project – Kinder Morgan Project Scheduler.
Create and manage level 3 construction schedule (500 lines) within Primavera
P6 and Microsoft Project for station work while ensuring compliance.
Responsible for tracking, schedule impacts and updating variances for the
compression station. Feb. 2013 – Feb. 2014 Chevron Permian
Basin Wolfcamp Project – Chevron, Texas Project
Planner/Scheduler.
Coordinated and supported the implementation activity of each development
area. Prepared project status reports including planning, tracking documentation and reporting.
Prepared level 4 project schedules (10000 lines) within Primavera P6 for
approximately 400 wells, developed actions plans, tracked the status of
deliverables. Proactively managed project dependencies, changes in project
scope, critical paths to devise contingency plans. Headlee
Project – Chevron, Texas Project Scheduler. Maintained level 2
Integrated Project Schedule (200 lines) to ensure alignment with the Rig
schedule. Responsible for updating project actuals into the Business plan. Sep. 2012 – Dec. 2012 Kinder Morgan Tennessee
Gas Pipeline and VMA Project – Kinder Morgan, Houston Project
Planner/Scheduler.
Defined, developed and oversaw the level 3 project schedules (1200 lines)
within Microsoft Project. Developed and delivered progress reports, schedule
impacts, and activity look-ahead report. June 2009 – Aug. 2012 Just Energy Windmill
Installation Project – Just Energy, Houston Project
Scheduler/Master Scheduler/Planner. Developed level 3 project schedule (1200 lines) within
Primavera P6 and specified goal strategy. Worked as liaison between the
consulting team and business team to identify the cutover requirements and
appropriate resources. Effectively contributed as part of the team in attaining
goals. Provided hands-on support to the development and maintenance of Work
Breakdown Structures (WBS) and budgets that lead to the establishment of a
cost/schedule baseline. EDUCATION______________________________________________________________________________ B.S. Information Technology
Management, University of Houston, Houston, TX, 2014 PROFESSIONAL TRAINING_______________________________________________________________ Specialized Trainings &
Certifications · Measurement and Balancing,
Kinder Morgan 2012 · Project Management
Professional (in view) – Project Management Institute (PMI) · Capital Stewardship
Organizational Capability (CSOC) · API 570 – Piping Inspector
(in view) · CSOC Gold Standard and Gold
Standard Assessment 2013 · Chevron Project Development
& Execution Process (CPDEP) · Cost Tool – Wellview,
ARIBA, SAP, Deltek Vision Page 1
of 3 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|